
1
12
TUNE-UP PROCEDURE
A “Tune-Up,” as listed below, would normally be performed on relatively new engines brought in for minor difficulties.
Performing these steps will either assure that the engine is functioning properly or will point out necessary repairs.
These steps are also covered in the Overhaul Procedure and will normally be performed as a part of the complete
overhaul.
STEP NO.
1. Remove spark plug lead from spark plug.
2. Remove air cleaner.
3. Check oil level and drain. (Clean fuel tank and lines if separate from carburetor.)
4. Remove blower housing, inspect rope and rewind assembly and starter clutch if equipped.
5. Clean cooling fins and entire engine.
6. Rock flywheel counterclockwise to check compression or do cylinder leakage test.
7. Remove carburetor, disassemble and inspect for wear or damage. Wash in solvent, replace parts as
necessary and assemble. Set initial adjustment.
8. Inspect crossover tube or intake elbow for damaged gaskets.
9. Check air vane governor blade, linkage and spring for damage or wear.
10. Remove flywheel, check for oil seal leakage, both flywheel and PTO sides. Check flywheel key.
11. Check armature, inspect all wires for breaks or damaged insulation. Be sure lead wires do not touch
flywheel. Check stop switch and lead.
12. Install flywheel. Time engine if necessary. Set air gap. Check for spark with #19051 or 19368 tester.
13. Remove cylinder head, check gasket, remove spark plug, and clean carbon. Inspect valves for proper
seating.
14. Replace cylinder head. Torque to specifications, set spark plug gap or replace plugs if necessary.
15. Replace oil and fuel, check muffler for restrictions or damage.
16. Adjust remote control linkage and cable (if used), for correct operation.
17. Service air cleaner. Check gaskets and element for damage.
18. Run and adjust mixture and top speed.
Commenti su questo manuale